The Bank - Internal Construction Update

Works within the fifteen apartments at The Bank are progressing well with the majority of the apartments fully plastered. We're in the process of introducing features back into the building including plastered cornicing and various panel detailing. The extended part of the building and the central lightwell feature have had heritage aluminium windows installed with glazing bars with the original white glazed bricks visible. The original sash windows have been replaced with identical hardwood sash windows, with acoustic double glazing. We're using plastered downlighters for subtle architectural lighting. The next stages of construction will involve fitting the engineered wood flooring and co

The Bank - Penthouse Progress Update

Works on the 2700 square foot Penthouse at The Bank, Cardiff Bay are progressing well under the protection of the temporary roof. The steel frame is complete, with the lift shaft brought through directly into the Penthouse now extended. The Penthouse is an additional storey to the listed building sitting on top of where the old flat roof and plant was. With nearly 900 foot of external space this will be a stunning space to live in. The temporary roof will be coming down once the roof covering is complete and we will be able to install the extensive full height glazing.

RECENT POSTS

ARCHIVE POSTS

 
 
 

GET IN TOUCH:

Quin & Co

66 Albany Rd,  Cardiff CF24 3RR

Tel: 02920 443810

Email: john@quinco.co.uk

SIGN UP FOR LATEST PROJECTS

© 2020 by CPS Homes